Yesterday morning, the E-Props team in charge of the works on the building poured the concrete slab of the extension dedicated to the technical room of the new 4000 m² plant (soon in service).
This technical room will house the ventilation system, filtration, heat exchanger, heating by heat pump with storage (to promote self-consumption photovoltaic) and air conditioning by evaporation of rainwater.
Congratulations to this team who did a great job !
Leave a Reply
You must be logged in to post a comment.